Installation from survey to handover

We coordinate and check the whole installation process. We present our work in eight clear steps.

Step by step

  1. Site survey

    We survey the premises precisely and set out the position of each structure from the drawings. We use a Hilti PR 30-HVS laser and Hilti optical measuring instruments.

  2. Installation documentation

    Based on the survey, we prepare the installation documentation in line with the regulations of the country where the project is built.

  3. Unloading and material transport

    We unload the material with a forklift and move it to the installation area. Handling is done by staff with documented forklift operator training.

  4. Welding

    Our own staff weld the steel structures, and we check the work continuously as it progresses. Welding and installation come from one contractor.

  5. Installation

    We carry out the complete installation of steel structures, racking systems and mezzanines, with a focus on precision and safe work. Our staff hold documented work-at-height training.

  6. Site clean-up

    We keep the work area tidy throughout the job. When installation is finished, we do a final clean-up and hand the space over clean.

  7. Handover protocol

    On site, we draw up the handover protocol with you, recording the scope and condition of the completed work.

  8. Handover and acceptance

    We are there in person for the final acceptance. We go through the finished installation together and answer your questions.

Installation services

We work in warehouses and production facilities.

  • Pallet racking
  • Automated racking systems
  • Automated storage systems (AKL, APL)
  • Steel structures
  • Mezzanine floors
  • Timber and steel grating floors
  • Rails
  • Roller conveyors
  • Order-picking systems
  • Fire sprinkler systems

We install for your project

Send us your requirements and the project location. We will get back to you as soon as possible and agree the next steps.

Call Request a quote