Installation of steel structures, mezzanines and racking systems

In warehouses and production facilities. We manage the whole installation, from the first site survey to the handover protocol on site.

Projects in: NetherlandsGermanyBelgiumRussia

  1. 01 Site survey First, we survey the building.
  2. 04 Welding We weld and supervise the whole process.
  3. 05 Installation We install the complete structure.

From survey to handover in 8 steps See the process

Request a quote Call +420 777 677 119

What we install

Racking, mezzanines and steel structures

We work in warehouses and production facilities. As well as racking and steel structures, we install fire sprinkler systems.

For example, we install

  • Pallet racking
  • Automated racking systems
  • Automated storage systems (AKL, APL)
  • Steel structures
  • Mezzanine floors
  • Timber and steel grating floors
  • Rails
  • Roller conveyors
  • Order-picking systems
  • Fire sprinkler systems

Process

From survey to handover in 8 steps

We manage and oversee the whole process.

  1. Site survey

    We survey the premises precisely and set out the position of each structure from the drawings. We use a Hilti PR 30-HVS laser and Hilti optical measuring instruments.

  2. Installation documentation

    Based on the survey, we prepare the installation documentation in line with the regulations of the country where the project is built.

  3. Unloading and material transport

    We unload the material with a forklift and move it to the installation area. Handling is done by staff with documented forklift operator training.

  4. Welding

    Our own staff weld the steel structures, and we check the work continuously as it progresses. Welding and installation come from one contractor.

  5. Installation

    We carry out the complete installation of steel structures, racking systems and mezzanines, with a focus on precision and safe work. Our staff hold documented work-at-height training.

  6. Site clean-up

    We keep the work area tidy throughout the job. When installation is finished, we do a final clean-up and hand the space over clean.

  7. Handover protocol

    On site, we draw up the handover protocol with you, recording the scope and condition of the completed work.

  8. Handover and acceptance

    We are there in person for the final acceptance. We go through the finished installation together and answer your questions.

View down a narrow aisle between tall steel racks

About us

Many years of installation experience

We founded MarkZPro in 2023 on many years of hands-on experience installing steel structures and racking systems. We are based in Prague.

What we take pride in

  • We keep to deadlines

    We plan our work so the job is finished on the agreed date.

  • We communicate openly

    From the first conversation to handover, we deal with you directly and clearly.

  • We build long-term partnerships

    We give every job proper care, so you can turn to us with confidence next time too.

What makes us different

We provide the equipment, the measuring instruments and the experienced team that does the installation. We take care of transport by forklift, delivery, installation and cleaning the site after completion.

You never know where we go next

Projects we have worked on

Photos taken on site show our work in warehouses and production halls.

Globe with MarkZPro projects and the Prague head office

Certificates

Our training is on record

You can view and download the training records as PDFs.

All certificates

Equipment

Our own vehicles and Hilti tools

We drive to sites in our own cars and vans and work with Hilti tools. That lets us respond flexibly to new jobs.

We install for your project

Send us your requirements and the project location. We will get back to you as soon as possible and agree the next steps.

We are looking for people to work with

Want to work with us? Get in touch.

Careers
Call Request a quote